House foundations in Christchurch

Know your options before the pour

Underfloor heating, insulation, a polished floor, where the pipes and ducts run — every one of them is decided before the concrete goes in.

Call027 610 8111

A pod slab

Your floor is poured once. Decide what goes in it first.

Almost everything in a house can be changed later. A short list cannot, and nobody hands it to you.

A model of the slab shows here when the page can draw it.

  1. Power, water and data come up through the floor where you want them.

    You decide · cast in before the pour

  2. A shower with no lip.

    You decide with your designer · before the boxing goes down

  3. The shower wastes, a riser, and the runs out to the slab edge.

    Your plumber sets them where the plans put them · before the pods go down

  4. A warm floor

    Underfloor heating pipe is tied to the steel before the pour.

    You decide · before the boxing goes down

  5. Finished and sealed as the floor you walk on.

    You decide the finish · before the pour

  6. Under the slab, at the edge, both or neither: five ways.

    Your designer, against H1 · before the pour

Where you start

Who we help

Building your own home

You have bought a section, or you are about to. Decide what you want under the floor while it can still be changed, and know who signs off each part of it.

Building a home

Builders

You are pricing a house and need the foundation settled before the frame. What we need to price it, what you get back, and who decides the rest.

For builders

A pod raft goes in, in this order

  1. A crew member in an Ultimate Foundations shirt checking the string line along the boxing, seen from behind

    Set out

    The building platform is cleared and levelled to the heights on the plans.

  2. Two people at the edge of an excavation, an excavator working on the hill behind them

    Excavate

    Cleared and levelled, with the machinery the platform needs.

  3. A crew member driving a waratah in to hold the boxing, an excavator behind

    Boxing

    The edges are boxed.

  4. A boxed building platform covered in white insulation pods laid in a grid, houses and hills beyond

    Membrane and pods

    The goes down, then the pods on their spacers.

  5. A crew member tying steel over the pods, the boxing along the edge and hills beyond

    Steel

    Then the steel in the ribs and edge beams and the mesh over the pods.

  6. Services

    The plumber and the electrician set their pipes and ducts where the plans put them.

  7. Council inspection

    Nothing is poured until the council has inspected.

  8. A boom pump pouring a steel-and-pod floor on a rise while a client and a child watch from the boxing

    Pour and cure

    And then the slab is poured and left to cure.

On site

Who you are dealing with

UF builds pod raft foundations for and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.

About us

Two crew members fitting edge insulation along the boxing, a site radio beside them
A crew member carrying waratahs along the boxing on a gravel platform, an excavator behind
Two crew members at the edge of the platform, one carrying a pod, edge insulation and boxing in front
A crew member in hi-vis cutting a length of edge insulation to fit beside the boxing
Two workers laying insulation and pods along a boxed edge, seen along the length of the platform

The guides

Looking something up

Every fact on this site carries its source and the date that source was read.

Start here

A boxed platform ready to pour on a wide, flat rural section, trees along the boundary and a ute beyond

Know your ground

Look up your section's technical category, and read what your geotechnical report decides.

Tied reinforcing bars over white insulation, close

Check who you hire

Look up a builder's or contractor's licence and records yourself, before you sign.

Technical category (TC1, TC2, TC3)The categories of residential land on the flat in greater Christchurch, TC1 to TC3, as MBIE's Canterbury guidance defines them.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read it at the sourceRead the guideDamp-proof membrane (DPM)A membrane, usually polyethylene sheet, laid under a slab to stop moisture vapour rising from the soil into the concrete and the building interior.BRANZ Appraisals 964 and 1054; MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3, Appendix A4.3.2; Firth, RibRaft Technical Manual (October 2024), Section 2 clause 3.6 · as at 15 September 2026Read the guide